Build up a Five-a-side football field
with lighting system for Sporting club
Installation of
co2 system
Installation of RO plant
(Water treatment system)
Building up air conditioning
system
Building up air aluminum molded production
line to produce aluminum pieces
Installation of exhaust
roof top fan
Building up compressed
air system (8 bar – 40 bar)
PMC Services
Automation solutions
” PLC control”
FM200 and Deluge
system
Plumbing
and Drainage
Sheet Metal
Fabrication
Kitchen Hood
and Exhaust system
Fire Fighting
Protection System
Heat isolation
for piping systems
Heat Tracing
systems
Compressed air
systems
Cooling and freezing
systems
Fire Detection
and Alarm
Smoke Exhaust
systems
processing lines
solutions
Mechanical Car Park
Ventilation
Heating, ventilation,
and air conditioning
Design and Build
Mechanical Services